Services and Capability
- Full Turn Key Solution
- Design and Build
- Main Contractor Role
- Reinforced Concrete Frame
- Ground Works
- Temporary Works Design and Installation
- Large and Small Diameter Piling
- Staff Training
- Sheet Piling Specialists
- Tower Crane Hire and Sales
- Mobile Crane Hire
- Concrete Pump Hire
- Prefabricated Staircase Sales
- Precast Column Innovation
Groundwork & Concrete Frames
J Reddington Limited (JRL), is a
recognised industry leading contractor who's core business is groundwork and concrete frame construction.The business was founded in 1996 by John Reddington and today has an annual turnover in excess of £120m. For more information, please visit
UK Façades Limited
UK Façades Limited (UKF), use in house resources to deliver your full envelope solutions from design through construction and beyond.UK Façades Limited, can deliver your windows, doors, rainscreen, render, terracotta, curtain walling, structural steel framing, cladding panel, or traditional brick solutions.
Ground Engineering
- Large Diameter CFA Piles
- Sheet Piling Specialists
- Professional Design Service
- Expert Rotary Pile Division
Miller Piling Limited (MP) is a young, dynamic organisation with a healthy portion of entrepreneurialism.
With an ever evolving fleet of Piling Rigs, MP offers small to large diameter CFA and Rotary drilled piles, as well as ground treatment, stabilization, geothermal and biomediation capabilities.
Tower Crane Hire & Sales
London Tower Crane Hire & Sales LImited (LTC) offers craneage solutions to meet a wide range of demands, including sites with restricted access.
Ranging from small, self erecting cranes through to 600m/t tower cranes, LTC are confident they can offer their Clients a Service That Counts.
Prefabricated Staircases
Stair Master's permanent formwork and handrails offer direct cost savings for concrete stairs. Following the trend for off-site prefabrication, Stair Master provide a simple lightweight stair shell that is fast to install. Stairs are installed with a permanent handrail providing edge protection during the pour and eliminating the need for temporary rails.
The metal formwork is manufactured in advance and arrives on site in a compact stack allowing progressive installation as required. Progressive installation ensures stairs can be installed with the main decks, providing clear, safe access for site personnel.www.stairmaster.ltd.uk

